Q1 |
What
are the basic construction & constituent of Air
Control Unit? |
 A1 |
(I) Control Valve (PIVC) Section (II) Air Pressure
Set Section (III) Limited Switch Section |
Q2 |
When
do you use air control unit? And what are the conveying
materials? |
 A2 |
Air
control unit can be use in petrochemical and chemical
industrial for process, temperature, pressure and
flow rate control system. The conveying materials
are process material & product and steam.
|
Q3 |
Selection
of control valve (PIVC) |
 A3 |
- Control valve use flow rate, pressure rate, temperature
and pressure difference to calculate the CV (calculation
formula for control vale) rate.
- Determine by the difference type of conveying
material and the pressure difference of the material
- By use the conveying material pressure to select
the flange size.
|
Q4 |
When
can you use diverter valve? |
 A4 |
Diverter
valve is mostly applied in the field of chemicals mud
treatment, waste water, dust, lime, the processing for
cements fertilizer and raw materials of food.
It is especially suitable for transporting the powders
of high viscosity. The applied pressure could be 5000~12000
mmHg for low-density's and high density of (6Kg/m2G)
or under non-pressure but just by gravity for conveying
into piping or tanks. |
Q5 |
What
are the basic construction & Constituent? |
 A5 |
(I)
Valve ( II ) Actuator ( III ) General Accessories |
Q6 |
Standard
inspection procedures |
 A6 |
- Inspect the body dimensions & fitting ports
of the valve according to the procurement specifications.
- Check the actuator of the valve body(i.e. operation
type) according to the procurement specifications.
- Check all the accessories which shall meet the
procurement list.
- Inspect if the valve body has been deformed,
distorted or damaged.
- Inspect if the actuator (of cylinders or handles)
and the accessories are fixed tightly.
- Check the valve performance by compressed air
of 4~7kg/cm2 G for pneumatic types and
by hand operation for manual types to assure it
is in good condition.
|
Q7 |
Standard operation procedures when assembly |
 A7 |
- Assure the removal of sealing tape or blind plate
on the fitting port (flange port).
- Be sure to clean up the interior of the valve
body thoroughly.
- The piping connected to the valve must also be
cleaned before being fitted up, especially assure
the removal of residual chips left during welding
and cutting of the pipes.
- Support the valve body properly according to the
weight and the size.
- When assemble the electrical wiring, always check
the space being enough for valve actions, the connection
being constantly in contact, the protection tubing
be fixed in according to the regulations concerned
for reasonable cladding.
- When assemble the electrical wiring, assure to
be done in accordance with the safety regulations
in force.
- Safety procedures must be applied to all the electrical
components for explosion protection in accordance
with the regulations concerned, if so required.
|
Q8 |
Running
Test |
 A8 |
- Check the valve body and be sure there is not
deformed or damaged.
- Check the actuator and be sure it is fixed completely.
- Check all the accessories and be sure all of them
are in good condition and secure properly.
- Check the piping of compressed air, and be sure
they are leak-tightly sealed and properly fixed.
The piping shall be so arranged that the actions
of the valve would not be barricaded.
- Check all the electrical wiring and be sure that
they are fixed properly with correct connection.
- Supply sufficient compressed air the F.R.L. combination
and to the solenoid valve in this diverter valve.
The air here must be supplied at the pressure of
4~6kg/cm2G
- Push the manual button of the solenoid valve and
check the actions of the valve being normal or not.
At the same time, adjust the speed by regulating
the speed controller to meet the requirement.
- Check the air piping and be sure they are leak-tighted.
- While above-all is ready without problem, switch
the manual operation to the auto operation of the
solenoid valve. At this time, the system will run
under automatic controlling.
- Do not change the flowing directions when there
are raw materials still in the body of diverter
valve. Otherwise, the valve could be damaged.
|
Q9 |
Maintenance |
A9 |
- Periodically check the oil in oil cup of the F.R.L.
combination. Oil-change or refill shall be done
regularly every 2~4 weeks. The lubricant oil shall
be of "R32".
- Regularly check the valve body and all the accessories
and be sure the fixing and functions are in good
condition. Repair or replace any one part or component
if it is found out of order.
|
|
|
 |
 |
 |
 |
 |
 |
 |
|